Location:
South Kazakhstan region/ Kazakhstan
Admission to the operation:
2010 year
Property type:
Weir

dam length – 44.7 km
average dam height – 7.7 km
channel length – 16 km

The main hydro complex project content:
- approach channel – carrying capacity 2300 m3/sec
- canal width – 250 meters on the bottom, height – 9 meters
- length – 450 meters;

2 hydro gates on the approach channel and approach canal.

Hydro complex with water outlet and water intake:
Total volume of concrete works – 74 413 m3
Total volume of earth works – 5 565 848 m3
Total volume of rubbleworks – 137 012 m3
Water intake with carrying capacity - 500 m3/sec with total length - 54 m
Water outlet with carrying capacity - 1800 m3/sec with total length - 100 m
Downstream channel with carrying capacity - 1800 m3/sec
Channel width - 250-150 meters, height - 8,5 meters, length - 1670 m
Protection dam length - 11 527 m, width on the upper side - 8 m
Left shore dam length - 11 527 m, width on the upper side - 5 m
Approach channel with carrying capacity - 500 m3/sec
Channel width in the bottom - 65 meters, length on the axis - 1800 m
Total dam length - 44 600 m
Width of sloping plates – 20-32 m
Width of dam crest – 8 m
Volume of the gravel cover - 111 337 m3
Total volume of concreting of the dam slope – 217 198 m3